Storage & Detention

Area : United Kingdom & Ireland Area
Country : United Kingdom
Direction : Export
Effective Date : 01/11/2020
Expiry Date : Until further notice
Free time : Calendar day
Currency : GBP
Invoiced : Per container, per calendar day, per container size type

 

Export Detention (all UK ports including Belfast)

Equipment detention commences on and includes the day that the empty container is collected and ends on the day that the full container is gated-in at the first load port.

Days 20’ DRY 40’ / 40’hc 45’ DRY 20’ Flat & Open top 40’ Flat & Open top 20’ REEF 40’ REEF
1 to 7 free free free free free free free
8 to 14 free free free free free 45 72
15 to 21 15 24 24 35 56 55 88
22 onwards 25 40 40 45 72 65 104

 

  • Non-operating reefer (NOR) will be charged as DRY equipment
  • Shippers’ own containers (SOC) will not be subject to equipment detention charges
  • The free time & charges applied will be those in place on the origin price calculation date (PCD)

 

Export Demurrage (all UK ports except Belfast) 

Demurrage (including equipment & storage) commences on and includes the day that the full container is gated-in at the first load port and ends on the planned arrival day of the vessel on which, at time of gate-in, the container is booked to load. 

Days 20’ DRY 40’ / 40’hc 45’ DRY 20’ Flat & Open top 40’ Flat & Open top 20’ REEF 40’ REEF
1 to 6 free free free free free free free
7 to 8 free free free free free 40 40
9 to 14 25 50 50 35 70 65 90
15 onwards 40 80 80 50 100 80 120

  

  • Non-operating reefer (NOR) will be charged as DRY equipment
  • Reefer demurrage includes plug-in/electricity charges
  • Shippers’ own containers (SOC) are subject to demurrage applicable to the equipment size/type
  • The free time & charges applied will be those in place on the origin price calculation date (PCD)

 

Export Demurrage (Belfast only) 

Demurrage (including equipment & storage) commences on and includes the day that the full container is gated-in at the first load port and ends on the planned arrival day of the vessel on which, at time of gate-in, the container is booked to load. 

Days 20’ DRY 40’ / 40’hc 45’ DRY 20’ Flat & Open top 40’ Flat & Open top 20’ REEF 40’ REEF
1 to 6 free free free free free free free
7 to 14 free free free free free 40 40
15 to 21 40 40 40 50 50 80 80
22 onwards 60 60 60 70 70 100 100

 

  • Non-operating reefer (NOR) will be charged as DRY equipment
  • Reefer demurrage includes plug-in/electricity charges
  • Shippers’ own containers (SOC) are subject to demurrage applicable to the equipment size/type
  • The free time & charges applied will be those in place on the origin price calculation date (PCD) 

  

 

Area : United Kingdom & Ireland Area
Country : United Kingdom
Direction : Export
Effective Date : 01/11/2019
Expiry Date : Until further notice
Free time : Calendar day
Currency : GBP
Invoiced : Per container, per calendar day, per container size type

 

Export Detention (all UK ports/terminals including Belfast)

Equipment detention commences on and includes the day that the empty container is picked up and ends on the day that the full container is gated-in to the terminal/port.

Days 20’ DRY 40’ / 40’hc 45’ DRY 20’ Flat & Open top 40’ Flat & Open top 20’ REEF 40’ REEF
1 to 7 free free free free free free free
8 to 14 free free free free free 55 55
15 onwards 25 25 25 55 55 75 75
  • NOR will be charged as DRY equipment
  • SOC will not be subject to equipment detention charges
  • New Year, Easter and Christmas holidays count unless they fall within the allowed free time period

 

Export Demurrage (all UK ports/terminals except Belfast)

Demurrage (including equipment & storage) commences on and includes the day that the container is gated-in full at the port/terminal and ends on the planned arrival day of the vessel on which the container is booked to load at time of gate-in.

Days 20’ DRY 40’ / 40’hc 45’ DRY 20’ Flat & Open top 40’ Flat & Open top 20’ REEF 40’ REEF
1 to 7 free free free free free free free
8 free free free free free 105 105
9 onwards  35 50 50 50 65 105 105
  • NOR will be charged as DRY equipment
  • Reefer demurrage includes plug-in/electricity charges
  • SOC are subject to demurrage at the rate applicable to the equipment size/type
  • New Year, Easter and Christmas holidays count unless they fall within the allowed free time period

 

Export Demurrage (Belfast only)

Demurrage (including equipment & storage) commences on and includes the day that the container is gated-in full at the port/terminal and ends on the planned arrival day of the vessel on which the container is booked to load at time of gate-in.

Days 20’ DRY 40’ / 40’hc 45’ DRY 20’ Flat & Open top 40’ Flat & Open top 20’ REEF 40’ REEF
1 to 6 free free free free free free free
7 to 8 free free free free free 29 29
9 to 14 35 50 50 50 65 64 79
15 onwards 55 70 70 70 85 84 99
  • NOR will be charged as DRY equipment
  • Reefer demurrage includes plug-in/electricity charges
  • SOC are subject to demurrage at the rate applicable to the equipment size/type
  • New Year, Easter and Christmas holidays count unless they fall within the allowed free time period
country flag

Safmarine United Kingdom

The Plaza
12th Floor
100 Old Hall Street
L3 9QJ Liverpool United Kingdom
safmarine stamps background