Depot, Demurrage & Detention

Export Demurrage and Detention

Tariff charges effective 1 January 2017

 

Export: Customers will be offered Combined Demurrage & Detention.

This means you will have one combined free time period and compensation for utilisation of equipment inside and outside of terminals or depots, referred to as Combined Demurrage & Detention.

The Demurrage Export will be calculated based on the actual “Load” date of the container, there will be a change from vessel ETA today to Load where Maersk Line considered to increase additional 1 day export free day from 2016 tariff. Calculation method is maintained as Progressive calculation.

 

Export Combined Demurrage and Detention Tariff

Days (MYR)

20’ DRY

40’ / 40’hc

45’ DRY

20’ REEF / Special

40’HREEF/ Special

IMO

Day 1-8

0

0

0

0

0

Same as DRY

Day 9-10

42

85

127

159

318

Day 11 onwards

85

127

212

212

371

If you have any further queries, please get in touch with your Safmarine representative.

country flag

Safmarine Malaysia

Suites C-5-6-7-8 &
D-5-6-7-8
Level 6
Sky Park @ One City
Jalan USJ 25/1
47650 Subang Jaya
Selangor
Malaysia
+603-8026-6690
safmarine stamps background